Eight weeks, three visits.
What happens at each visit, and how long each step takes. No surprises, and nothing rushed.





From the first measure to the final fitting.
- Measure and patternFirst visit, about an hourWe take 27 measurements and note how you stand. Your pattern is then drafted by hand on brown paper, and it stays on file.
- ChalkWeek oneThe paper goes down on your cloth and every line is chalked around it, with room left in the seams for the fittings.
- CutWeek twoThe pieces are cut with heavy shears, one jacket from one length of cloth.
- First fittingWeeks three to fiveYou try the jacket held together with white tacking. We pin, mark and recut where it matters.
- Final fittingWeeks six to eightThe finished suit. We check the hang of every seam before it leaves the lane.

What changes at a fitting goes on your pattern in red.
At the first fitting you wear the tacked jacket and we pin what needs to move. Back at the table every change is marked on your own pattern in red pencil, so the next suit starts already right.
Start with the measure.
The first visit is an hour of talking and measuring. Every step after it is planned back from the day you need the suit.
Your suit so far Navy worsted twill, notch lapel, two button
